Develop a Work Breakdown Structure
Develop a Work Breakdown Structure (WBS) and project schedule in a Gantt format for the E-Mail Upgrade Project described in the scenario. The WBS and resultant schedule should contain the following high-level activities:
1.0 Evaluate User & System Requirements
2.0 Evaluate ODHS Network Suitability
3.0 Conduct E-mail System Selection
4.0 Upgrade ODHS Network & Hardware
5.0 Develop E-mail Training
6.0 Deploy E-mail System
Each of the six WBS elements should be decomposed into two or more activities; additionally, three of these six elements should be decomposed into a third level consisting of at least two more activities. Thus, there should be six high level WBS elements, twelve or more second level activities (two per the six elements), and six third level activities. Use the format described above to define the activities (action verb followed by subject, such as Deploy E-mail System).
The Gantt chart should be developed based on the WBS (all activities should be detailed on the Gantt chart). The Gantt chart should reflect the proper dependencies of each of the activities (for example, you can’t have “Deploy E-mail System” before “Evaluate User Requirements”). For activity duration, provide a reasonable estimate of the time you expect each activity to take; while students are not expected to provide accurate durations, durations should be reasonably defensible and logical. For formatting ease, high level activities should be left justified while second and third level activities should be indented below their parent activities.
We've got everything to become your favourite writing service
Money back guarantee
Your money is safe. Even if we fail to satisfy your expectations, you can always request a refund and get your money back.
Confidentiality
We don’t share your private information with anyone. What happens on our website stays on our website.
Our service is legit
We provide you with a sample paper on the topic you need, and this kind of academic assistance is perfectly legitimate.
Get a plagiarism-free paper
We check every paper with our plagiarism-detection software, so you get a unique paper written for your particular purposes.
We can help with urgent tasks
Need a paper tomorrow? We can write it even while you’re sleeping. Place an order now and get your paper in 8 hours.
Pay a fair price
Our prices depend on urgency. If you want a cheap essay, place your order in advance. Our prices start from $11 per page.